Talkeetna Airport Improvements (2016 & 2017) Scope: Resurface all existing pavement, construct a new Transient Apron, a General Aviation Apron,
connection taxiways, taxilanes, a pathway, and access roads. Clearing for airspace obstructions is also
included. Impacts: Parallel taxiway to be used as 50’ x 3000’ unpaved temporary runway during runway
rehabilitation. Taxiway A and E to be closed simultaneously, Taxiways B, C, and D to be closed
simultaneously, existing apron to be constructed in four phases. Construction Project Manager: Laura Paul, 269-0463 Information from the state can be found at the DOT website. The current project is based on the studies done in 2007. Current project data is found under the 2016 data. |