An erosion control project was originally placed by the US Army Corps of Engineers in 1951 and the permanent project was constructed in 1979. The project included a soil and steel piling facine, 1150 feet or armored dike and 1650 feet of armored revetment. 

Damage to the dike was reported after the 2012 flood event.

MatSu Borough Assembly - Aug 17 2016:
AM No. 16-073: Award Of Proposal No. 17-005P To HDL Engineering Consultants, LLC. In The Contract Amount Of $176,837 For Talkeetna Dike Repair Design.